New Haven Jr/Sr High School Renovations

East Allen Community Schools
           Place Order 

Premier Partner Program 

    

Contact:   Kevin Runkel
PreBid Date:   06/15/2017 10:00 AM
PreBid Info:   Required site inspection and pre-bid conference will start at 10:00 a.m. Thursday, June 15, 2017 in the School Board Meeting Room located in the Administration Building located at 31 1240 State Road 930 East, New Haven, IN 46774. The site will be available for observation 32 following the pre-bid conference.

Company:   The Moake Park Group
Bid Date:   07/06/2017 02:00 PM
Bid Info:   Bid Date Extended

Project Location:
Bid Categories:  Subcontractor
Site Utilities
General Construction
Food Service Equipment
Mechanical/Plumbing/Fire Protection
Electrical Construction
(C) Eastern Engineering Use Only

Public Notes:
**When the remaining sets are no longer available, contractors will be required to purchase their sets***.

**No Planrooms Allowed***.

Notice to Bidders (PDF)




Job Purchase Information:
---Complete sets of bidding documents are available, for a $100 Refundable Deposit check per set, made payable to East Allen Community Schools (include the job name in the reference line).

---A maxiumum of 3 complete sets of documents will be issued to General Construction; a maxium of 1 complete set will be issued to mechanical/electrical contractors.---

---Fax a copy of the refundable deposit check (for shipping and delivery orders) to Eastern Engineering-Ft. Wayne Office AND deliver the original check (for all orders) to Eastern Engineering-Ft. Wayne Office.

---Only Complete sets of plans and specifications will be distributed. Any unsuccessful bidder, upon returning such sets in good and usuable condition within (10)ten days of the bid date will be refunded their deposit.---

---If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering Supply and are posted on the Spec Sheets tab.



Addenda
  • 06/16/2017 - 01 D1 Addendum 20170616 COMPLETE Addendum 1 was issued.  View Addendum
  • 06/19/2017 - Addendum D2 20170619 Addendum 2 is being emailed.  View Addendum
  • 06/23/2017 - 00 Addendum D3 FINAL Addendum 3 was issued.  View Addendum