Eastern Engineering  
   Site Options
Version 6.0.6.8
eTakeoff

Renovation for Blackhawk MS Kitchen

FWCS 2017 Capital Projects Fund Physical Plant Improvements (PPI) Projects
           Place Order 

Premier Partner Program 

    

Contact:   Kevin Grady
PreBid Date:   11/29/2017 10:00 AM
PreBid Info:   A Pre-Bid Conference will be held on November 29 at 10:00 am local time, in the Fort Wayne Community Schools Facilities Department Training Room, (enter south door), located at 1519 Catalpa Street, Fort Wayne, Indiana.

Company:   Fort Wayne Community Schools
Bid Date:   12/13/2017 02:00 PM
Bid Info:  

Project Location:
Bid Categories:  BIDDER
Subcontractor/Supplier
Plan Room
(C) Eastern Engineering Use Only

Public Notes:
PLANROOMS NOT ALLOWED!!!!!!!!!

All contractors must receive a minimum of 1 set to receive the downloads.

Notice to Bidders (PDF)




Job Purchase Information:
---Complete sets of bidding documents are available, for a $150 Refundable Deposit check per set, (Limit 2 Sets per contractor), made payable to Ft. Wayne Community Schools (include the job name in the reference line).

---Fax a copy of the refundable deposit check (for shipping and delivery orders) to Eastern Engineering-Ft. Wayne Office AND deliver the original check (for all orders) to Eastern Engineering-Ft. Wayne Office.

Only Complete sets of plans and specifications will be distributed. Any unsuccessful bidder, upon returning such sets in good and usuable condition within (10)ten days of the bid date will be refunded their deposit.

Additional sets may be purchased per the options and pricing listed on the Order page (plus $13 Processing Fee, Shipping when applicable, and Tax). Credit Card or Eastern Engineering Charge Account required before printing purchases.

---If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering Supply and are posted on the Spec Sheets tab.



Addenda
  • 12/06/2017 - Addendum 1 Addendum 1 is being emailed and shipped via UPS Ground.  View Addendum
  • 12/08/2017 - Addendum 2 Addendum 2 was issued.  View Addendum
  • 12/11/2017 - MEP Addendum 3 Addendum 3 is being emailed.  View Addendum