Eastern Engineering  
   Site Options
Version 6.0.6.8
eTakeoff

Renovation of Lane Middle School

FWCS School Building Basic Renewal/Restoration and Safety Project
           Place Order 

Premier Partner Program 

    

Contact:   Heather Krebs
PreBid Date:   11/30/2017 10:00 AM
PreBid Info:   A Pre-Bid Conference will be held on Thursday November 30, 2017 at 10:00am local time, in the Fort Wayne Community Schools Facilities Department Training Room, (enter Door 10), located at 1519 Catalpa Street, Fort Wayne, Indiana.

Company:   Fort Wayne Community Schools
Bid Date:   12/21/2017 02:00 PM
Bid Info:  

Project Location:
Bid Categories:  BIDDER
Subcontractor/Supplier
(C) Eastern Engineering Use Only

Public Notes:
PLANROOMS NOT ALLOWED!!!!!!!!!

All contractors must receive a minimum of 1 set to receive the downloads.

Notice to Bidders (PDF)




Job Purchase Information:
---Complete sets of bidding documents are available, for a $250 Refundable Deposit check per set, (Limit 1 Set per contractor), made payable to Ft. Wayne Community Schools (include the job name in the reference line).

---Fax a copy of the refundable deposit check (for shipping and delivery orders) to Eastern Engineering-Ft. Wayne Office AND deliver the original check (for all orders) to Eastern Engineering-Ft. Wayne Office.

Only Complete sets of plans and specifications will be distributed. Any unsuccessful bidder, upon returning such sets in good and usuable condition within (10)ten days of the bid date will be refunded their deposit.

Additional sets may be purchased per the options and pricing listed on the Order page (plus $13 Processing Fee, Shipping when applicable, and Tax). Credit Card or Eastern Engineering Charge Account required before printing purchases.

---If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering Supply and are posted on the Spec Sheets tab.



Addenda
  • 12/05/2017 - 20170088 Addendum 01 2017-12-05 Addendum 1 is being emailed and shipped via UPS Ground.  View Addendum
  • 12/12/2017 - 20170088 Addendum 02 2017-12-12 Addendum 2 is being emailed and shipped via UPS Ground.  View Addendum