Eastern Engineering  
   Site Options
Version 6.0.6.8
eTakeoff

FWCS 2018 General Building Systems (GBS) PPI

B/D #101401
           Place Order 

Premier Partner Program 

    

Contact:   Jayde Steffen
PreBid Date:   02/08/2018 01:00 PM
PreBid Info:   A Pre-Bid Conference will be held on Thursday, February 8, 2018 at 1:00pm local time, in the Fort Wayne Community Schools Facilities Department Training Room, (enter south door), located at 1519 Catalpa Street, Fort Wayne, Indiana.

Company:   Fort Wayne Community Schools
Bid Date:   02/21/2018 02:00 PM
Bid Info:  

Project Location:
Bid Categories:  Owner
Architect
01: Demolition
02: Masonry
03: Metal Fabrication
04: General Construction
05: P-Lam Casework
06: Doors and Hardware
07: Glazing
08: Gypsum Board
09: Acoustical Ceilings
10: Cubical Track/Curtains
11: Toilet Partitions
12: Metal Athletic Lockers
13: Gymnasium Wall Pads
14: Plumbing Contractor
15: HVAC Contractor
16: Electrical Contractor
17: Fire Alarm Contractor

Public Notes:
PLANROOMS NOT ALLOWED!!!!!!!!!

All contractors must receive a minimum of 1 set to receive the downloads.

Notice to Bidders (PDF)




Job Purchase Information:
---Complete sets of bidding documents are available, for a $100 Refundable Deposit check per set, (Limit 1 Set per contractor), made payable to Ft. Wayne Community Schools (include the job name in the reference line).

---Fax a copy of the refundable deposit check (for shipping and delivery orders) to Eastern Engineering-Ft. Wayne Office AND deliver the original check (for all orders) to Eastern Engineering-Ft. Wayne Office.

Only Complete sets of plans and specifications will be distributed. Any unsuccessful bidder, upon returning such sets in good and usuable condition within (10)ten days of the bid date will be refunded their deposit.

Additional sets may be purchased per the options and pricing listed on the Order page (plus $13 Processing Fee, Shipping when applicable, and Tax). Credit Card or Eastern Engineering Charge Account required before printing purchases.

---If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering Supply and are posted on the Spec Sheets tab.



Addenda
  • 02/16/2018 - 17069 FWCS 2018 GBS PPI Addendum No 01 Addendum 1 is being emailed.  View Addendum