Carmel Clay Fire Station #43 and the new Construction of Carmel Clay Fire Station #44

Order

Carmel Clay Fire Station #43 and the new Construction of Carmel Clay Fire Station #44

Contact

Company Contact

Envoy Inc (Indianapolis)
John Barbee
Location

Location


Pre-Bid Information

Pre-Bid Information

05/28/2015 02:00 PM
Bid Information

Bid Information

06/23/2015 02:00 PM

Bid Categories

#43-01.2-Sitework &General Trades
#43-02.2-Demolition(included in 01.2)
#43-03.2-Concrete(included in 01.2)
#43-05.2-Structural Steel(included in 01.2)
#43-06.2-Woods/Plastics(included in 01.2)
#43-09.2-Gypsum Wall Boards/Acoustical
#43-09.4-Carpet/Exercise Flooring/Tile
#43-09.6-Painting
#43-10.2-Specialties(included in 01.2)
#43-11.2-Equipment(included in 01.2)
#43-12.2-Furnishings(included in 01.2)
#43-21.2-Fire Protection
#43-22.2-Plumbing(included in 23.2)
#43-23.2-Mechanical
#43-26.2-Electrical
#43-27.2-Communication(included in 26.2)
#43-28.2-Electrical Safety & Security(included in 26.2)
#43-31.2-Earthwork(included in 01.2)
#44-01.1-Sitework &General Trades
#44-02.1-Demolition(included in 01.1)
#44-03.1-Concrete(included in 01.1)
#44-05.1-Structural Steel
#44-06.1-Woods/Plastics(included in 01.1)
#44-09.1-Metal Studs/Gypsum/Acoustical
#44-09.3-Carpet/Resilient Flooring/Tile
#44-09.5-Painting
#44-10.1-Specialties(included in 01.1)
#44-11.1-Equipment(included in 01.1)
#44-12.1-Furnishings(included in 01.1)
#44-14.1-Conveying Equip(included in 01.1)
#44-21.1-Fire Protection
#44-22.1-Plumbing(included in 23.1)
#44-23.1-Mechanical
#44-26.1-Electrical
#44-27.1-Communication(included in 26.1)
#44-28.1-Electrical Safety & Security(included in 26.1))
#44-31.1-Earthwork(included in 01.1)
Combined #44&43-04.1-Masonry
Combined #44&43-07.1-Roofing
Combined #44&43-8.1-Glass &Glazing
Subcontractor/Supplier
Plan Room
(C) Eastern Engineering Use Only


Job Purchase Information:

Downloadable and Printed Sets of Bidding Documents may be ordered per the options listed on the Order page (plus $12 Processing Fee, and Shipping/Delivery and Tax when applicable). Credit Card or Eastern Engineering Charge Account required (before printing) for purchases.

If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set - see Spec Sheets tab) are paid to Eastern Engineering and are posted on the Spec Sheets tab.

PLEASE NOTE - IF YOU ORDER ONLY THE FREE DOWNLOADS FOR THIS JOB, IGNORE THE CHARGES THAT APPEAR AND BE SURE TO SELECT ''NO DEPOSIT/NO CHARGE'' AS YOUR PAYMENT OPTION.

*****ADDENDA ARE NOT INCLUDED IN PURCHASE SET PRICES UNLESS SPECIFICALLY STATED. ADDENDA ARE POSTED FOR DOWNLOADING ON THE INFORMATION TAB AND THE ADDENDA TAB.*****

Addenda

  • 05/27/2015 - Volume 4 cover 
  • 06/05/2015 - Addendum #1 (Large and Small Format) was emailed
  • 06/17/2015 - Addendum #2 (Large and Small Format) was emailed
  • 06/19/2015 - Addendum #3 (Tan) was emailed