Eastern Engineering Plan Room

Logo

Carmel Clay Fire Station #43 and the new Construction of Carmel Clay Fire Station #44

Order
 
 CS001
COVER SHEET
0010-CS001.TIF
 
 G002
LIFE SAFETY PLAN
0020-G002.TIF
 
 G003
ENVELOPE COMCHECK FLOOR PLAN
0030-G003.TIF
 
 CM101
STAGING AND LOGISTICS PLAN
0040-CM101.TIF
 
 CM102
PRELIMINARY BIDDING & CONSTRUCTION SCHEDULE
0050-CM102.TIF
 
 CS001
COVER SHEET
0055-CS001.TIF
 
 C101
EXISTING CONDITION PLAN
0060-C101.TIF
 
 C102
DEMOLITION PLAN
0070-C102.TIF
 
 C201
PROPOSED SITE PLAN
0080-C201.TIF
 
 C202
CONSTRUCTION DETAILS
0090-C202.TIF
 
 C203
PROPOSED OVERALL GRADING PLAN
0100-C203.TIF
 
 C204
PROPOSED GRADING PLAN
0110-C204.TIF
 
 C401
SANITARY SEWER PLAN
0120-C401.TIF
 
 C501
EROSION CONTROL PLAN
0130-C501.TIF
 
 C502
EROSION CONTROL DETAILS
0140-C502.TIF
 
 C503
STORM WATER POLLUTION PREVENTION PLAN
0150-C503.TIF
 
 C504
STORM WATER POLLUTION PREVENTION PLAN- DETAILS
0160-C504.TIF
 
 C601
UTILITY PLAN
0170-C601.TIF
 
 L101
LANDSCAPE PLAN
0175-L101.TIF
 
 L801
LANDSCAPE DETAILS
0176-L801.TIF
 
 S0.1
GENERAL NOTES AND ABBREVIATIONS
0180-S0.1.TIF
 
 S2.1
FOUNDATION PLAN
0190-S2.1.TIF
 
 S2.2
ROOF FRAMING PLAN
0200-S2.2.TIF
 
 S3.1
TYPICAL FOUNDATION SECTIONS AND DETAILS
0210-S3.1.TIF
 
 S5.1
SECTIONS AND DETAILS
0220-S5.1.TIF
 
 A001
GENERAL NOTES
0230-A001.TIF
 
 AD100
FIRST FLOOR DEMOLITION PLAN
0235-AD100.TIF
 
 A101
FIRST FLOOR PLAN
0240-A101.TIF
 
 A102
MEZZANINE FLOOR PLAN
0250-A102.TIF
 
 A103
REFLECTED CEILING PLAN
0260-A103.TIF
 
 A110
ROOF PLAN
0270-A110.TIF
 
 A201
BUILDING ELEVATIONS
0280-A201.TIF
 
 A202
BUILDING ELEVATIONS
0290-A202.TIF
 
 A300
BUILDING SECTIONS
0295-A300.TIF
 
 A301
WALL SECTIONS
0300-A301.TIF
 
 A302
WALL SECTIONS
0305-A302.TIF
 
 A500
OPENING INFORMATION
0310-A500.TIF
 
 A601
MILLWORK AND INTERIOR ELEVATIONS
0320-A601.TIF
 
 A602
MILLWORK AND INTERIOR ELEVATIONS
0330-A602.TIF
 
 A610
MILLWORK AND INTERIOR ELEVATIONS
0340-A610.TIF
 
 A611
MILLWORK AND INTERIOR ELEVATIONS
0350-A611.TIF
 
 A801
FINISH PLAN
0360-A801.TIF
 
 E001
ELECTRICAL SYMBOLS AND ABBREVIATIONS
0370-E001.TIF
 
 E501
ELECTRICAL DETAILS
0380-E501.TIF
 
 E502
ELECTRICAL DETAILS
0390-E502.TIF
 
 E601
ELECTRICAL SCHEDULES
0400-E601.TIF
 
 E801
ELECTRICAL POWER DISTRIBUTION DIAGRAM
0410-E801.TIF
 
 E101
ELECTRICAL SITE DEMOLITION PLAN
0415-E101.TIF
 
 E102
ELECTRICAL SITE PLAN
0416-E102.TIF
 
 ED101
ELECTRICAL FIRST FLOOR DEMOLITION PLAN
0420-ED101.TIF
 
 ED102
ELECTRICAL MEZZANINE FLOOR DEMOLITION PLAN
0430-ED102.TIF
 
 EL101
ELECTRICAL FIRST FLOOR LIGHTING PLAN
0440-EL101.TIF
 
 EL102
ELECTRICAL MEZZANINE FLOOR LIGHTING PLAN
0450-EL102.TIF
 
 EP101
ELECTRICAL FIRST FLOOR POWER PLAN
0460-EP101.TIF
 
 EP102
ELECTRICAL MEZZANINE FLOOR POWER PLAN
0470-EP102.TIF
 
 ES101
ELECTRICAL FIRST FLOOR SYSTEMS PLAN
0480-ES101.TIF
 
 ES102
ELECTRICAL MEZZANINE FLOOR POWER PLAN
0490-ES102.TIF
 
 PD101
PLUMBING FIRST FLOOR DEMOLITION PLAN
0500-PD101.TIF
 
 P100
PLUMBING UNDER FLOOR PLAN
0510-P100.TIF
 
 P101
PLUMBING FIRST FLOOR PLAN
0520-P101.TIF
 
 P501
PLUMBING DETAILS
0530-P501.TIF
 
 MD101
MECHANICAL DEMOLITION PLAN
0540-MD101.TIF
 
 M101
MECHANICAL FIRST FLOOR DUCTWORKPLAN
0550-M101.TIF
 
 M102
MECHANICAL FIRST FLOOR PIPING PLAN
0560-M102.TIF
 
 M601
MECHANICAL SCHEDULES
0570-M601.TIF
 
 G001
COVER SHEET
2010-G001.TIF
 
 G002
LIFE SAFETY PLAN
2020-G002.TIF
 
 CM101
STAGING AND LOGISTICS PLAN
2030-CM101.TIF
 
 CM102
PRELIMINARY BIDDING AND CONSTRUCTION SCHEDULE
2040-CM102.TIF
 
 CS
CIVIL COVER SHEET
2050-CS.TIF
 
 GN
GENERAL NOTES
2060-GN.TIF
 
 C101
EXISTING CONDITIONS PLAN
2070-C101.TIF
 
 C102
DEMOLITION PLAN
2080-C102.TIF
 
 C201
PROPOSED SITE PLAN
2090-C201.TIF
 
 C202
CONSTRUCTION DETAILS
2100-C202.TIF
 
 C203
CONSTRUCTION DETAILS
2110-C203.TIF
 
 C204
PROPOSED GRADING PLAN
2120-C204.TIF
 
 C301
STORM PLAN
2130-C301.TIF
 
 C302
STORM DETAILS
2140-C302.TIF
 
 C303
STORM DETENTION PLAN
2150-C303.TIF
 
 C304
STORM DETENTION DETAILS
2160-C304.TIF
 
 C305
WATER QUALITY PLAN
2170-C305.TIF
 
 C501
UTILITY PLAN
2180-C501.TIF
 
 C502
UTILITY DETAILS
2190-C502.TIF
 
 C601
EROSION CONTROL PLAN
2200-C601.TIF
 
 C602
EROSION CONTROL DETAILS
2230-C602.TIF
 
 C701
STORMWATERPOLLUTION PREVENTION PLAN
2240-C701.TIF
 
 C702
STORMWATERPOLLUTION PREVENTION PLAN MAPS
2250-C702.TIF
 
 L101
LANDSCAPE PLAN
2260-L101.TIF
 
 L102
RAINGARDEN PLANTING PLAN
2270-L102.TIF
 
 L801
LANDSCAPE DETAILS
2280-L801.TIF
 
 S0.1
GENERAL NOTES & ABBREVIATIONS
2290-S0.1.TIF
 
 S0.2
ABBREVIATIONS & GENERAL STRUCTURE AXONOMETRIC VIEWS
2300-S0.2.TIF
 
 S1.0
BASEMENT FOUNDATION PLAN
2310-S1.0.TIF
 
 S1.1
FIRST FLOOR FOUNDATION AND FRAMING PLAN
2320-S1.1.TIF
 
 S1.2
LOW ROOF AND SECOND FLOOR FRAMING PLAN
2330-S1.2.TIF
 
 S1.3
UPPER ROOF FRAMING PLAN
2340-S1.3.TIF
 
 S3.1
TYPICAL FOUNDATION DETAILS
2350-S3.1.TIF
 
 S3.2
TYPICAL FOUNDATION DETAILS
2360-S3.2.TIF
 
 S3.3
FOUNDATION SECTIONS
2370-S3.3.TIF
 
 S4.1
TYPICAL MASONRY DETAILS
2380-S4.1.TIF
 
 S4.2
LINTEL ELEVATIONS
2390-S4.2.TIF
 
 S5.1
TYPICAL FRAMING SECTIONS AND DETAILS
2400-S5.1.TIF
 
 5.2
FRAMING SECTIONS
2410-S5.2.TIF
 
 S5.3
FRAMING SECTIONS
2420-S5.3.TIF
 
 S6.1
BRACED FRAME ELEVATIONS
2430-S6.1.TIF
 
 S6.2
BRACED FRAME ELEVATIONS
2440-S6.2.TIF
 
 A001
GENERAL NOTES, SYMBOLS, LEGENDS & EXTERIOR WALLS
2450-A001.TIF
 
 A002
INTERIOR WALL TYPES AND DETAILS
2460-A002.TIF
 
 A100
ARCHITECTURAL SITE PLAN
2470-A100.TIF
 
 A101
BASEMENT CONSTRUCTION PLAN
2480-A101.TIF
 
 A102
FIRST FLOOR CONSTRUCTION PLAN
2490-A102.TIF
 
 A103
SECOND FLOOR CONSTRUCTION PLAN
2500-A103.TIF
 
 A104
ROOF PLAN
2510-A104.TIF
 
 A110
ENLARGED STAIR PLANS
2520-A110.TIF
 
 A120
PLAN DETAILS
2530-A120.TIF
 
 A201
EXTERIOR ELEVATIONS
2540-A201.TIF
 
 A202
EXTERIOR ELEVATIONS AND CAST STONE SHAPES
2550-A202.TIF
 
 A203
EXTERIOR 3D VIEWS
2560-A203.TIF
 
 A301
BUILDING SECTIONS
2570-A301.TIF
 
 A302
WALL SECTIONS
2580-A302.TIF
 
 A303
WALL SECTIONS
2590-A303.TIF
 
 A304
WALL SECTIONS
2600-A304.TIF
 
 A305
WALL SECTIONS
2610-A305.TIF
 
 A306
WALL SECTIONS
2620-A306.TIF
 
 A307
SECTION DETAILS
2630-A307.TIF
 
 A310
STAIR SECTIONS AND DETAILS
2640-A310.TIF
 
 A311
STAIR SECTIONS AND DETAILS
2650-A311.TIF
 
 A312
STAIR SECTIONS AND DETAILS
2660-A312.TIF
 
 A401
FIRST FLOOR REFLECTED CEILING PLAN
2670-A401.TIF
 
 A402
SECOND FLOOR AND BASEMENT REFLECTED CEILING PLAN
2680-A402.TIF
 
 A501
DOOR SCHEDULE
2690-A501.TIF
 
 A502
DOOR DETAILS
2700-A502.TIF
 
 A505
WINDOW ELEVATIONS
2710-A505.TIF
 
 A506
WINDOW DETAILS
2710-A506.TIF
 
 A601
INTERIOR ELEVATIONS
2720-A601.TIF
 
 A602
INTERIOR ELEVATIONS
2730-A602.TIF
 
 A603
INTERIOR ELEVATIONS
2740-A603.TIF
 
 A610
MILLWORK SECTIONS AND DETAILS
2750-A610.TIF
 
 A611
MILLWORK SECTION
2760-A611.TIF
 
 A701
INTERIOR FIRST FLOOR FINISH SCHEDULE
2770-A701.TIF
 
 A702
INTERIOR SECOND FLOOR FINISH SCHEDULE
2780-A702.TIF
 
 A801
EQUIPMENT PLANS AND SCHEDULES
2790-A801.TIF
 
 A901
EXTERIOR SIGNAGE
2800-A901.TIF
 
 A902
INTERIOR SIGNAGE PLAN
2810-A902.TIF
 
 M000
MECHANICAL GENERAL SYMBOLS AND ABBREVIATIONS
2820-M000.TIF
 
 MH101
MECHANICAL HVAC BASEMENT FLOOR PLAN
2830-MH101.TIF
 
 MH102
MECHANICAL HVAC FIRST FLOOR PLAN
2840-MH102.TIF
 
 MH103
MECHANICAL HVAC SECOND FLOOR PLAN
2850-MH103.TIF
 
 MH104
MECHANICAL ROOF PLAN
2860-MH104.TIF
 
 MP101
MECHANICAL PIPING BASEMENT FLOOR PLAN
2870-MP101.TIF
 
 MP102
MECHANICAL PIPING FIRST FLOOR PLAN
2880-MP102.TIF
 
 MP103
MECHANICAL PIPING SECOND FLOOR PLAN
2890-MP103.TIF
 
 M501
MECHANICAL DETAILS
2900-M501.TIF
 
 M502
MECHANICAL DETAILS
2910-M502.TIF
 
 M503
MECHANICAL DETAILS
2920-M503.TIF
 
 M601
MECHANICAL SCHEDULES
2930-M601.TIF
 
 P100
PLUMBING UNDER FLOOR PLAN
2940-P100.TIF
 
 P101
PLUMBING BASEMENT FLOOR PLAN
2950-P101.TIF
 
 P102
PLUMBING FIRST FLOOR PLAN
2960-P102.TIF
 
 P103
PLUMBING SECOND FLOOR PLAN
2970-P103.TIF
 
 P104
PLUMBING ROOF PLAN
2980-P104.TIF
 
 P501
PLUMBING DETAILS
2990-P501.TIF
 
 P601
PLUMBING SCHEDULES
3000-P601.TIF
 
 P901
PLUMBING WASTE AND VENT ISOMETRIC
3010-P901.TIF
 
 E000
ELECTRICAL SYMBOLS & ABBREVIATIONS
3020-E000.TIF
 
 EL101
ELECTRICAL BASEMENT LIGHTING PLAN
3030-EL101.TIF
 
 EL102
ELECTRICAL FIRST FLOOR LIGHTING PLAN
3040-EL102.TIF
 
 EL103
ELECTRICAL SECOND FLOOR LIGHTING PLAN
3050-EL103.TIF
 
 EP101
ELECTRICAL BASEMENT POWER/SYSTEM PLAN
3060-EP101.TIF
 
 EP102
ELECTRICAL FIRST FLOOR POWER/SYSTEM PLAN
3070-EP102.TIF
 
 EP103
ELECTRICAL SECOND FLOOR POWER/SYSTEM PLAN
3080-EP103.TIF
 
 ES101
ELECTRICAL BASEMENT SYSTEMS PLAN
3090-ES101.TIF
 
 ES102
ELECTRICAL FIRST FLOOR SYSTEMS PLAN
3100-ES102.TIF
 
 ES103
ELECTRICAL SECOND FLOOR SYSTEMS PLAN
3110-ES103.TIF
 
 E501
ELECTRICAL DETAILS
3120-E501.TIF
 
 E502
ELECTRICAL DETAILS
3130-E502.TIF
 
 E503
ELECTRICAL DETAILS
3140-E503.TIF
 
 E601
ELECTRICAL SCHEDULES
3150-E601.TIF
 
 E602
ELECTRICAL SCHEDULES
3160-E602.TIF
 
 E801
ELECTRICAL RISER DIAGRAM
3170-E801.TIF