FWA Hangar 2003 Apron Expansion
Choose Plan Sheet:
»
G0.0.0 - TITLE SHEET
G0.0.1 - SHEET INDEX AND ESTIMATE OF QUANTITIES
G0.0.2 - MASTER LEGEND AND ABBREVIATIONS
G1.1.1 - SCOPE OF WORK
G1.1.2 - SURVEY CONTROL PLAN
G1.1.3 - SITE LOGISTICS PLAN
G2.1.1 - OVERALL CONSTRUCTION SAFETY AND PHASING PLAN (CSPP)
G2.1.2 - DETAILED CSPP
G2.1.3 - DETAILED CSPP - ALTITUDE DRIVE DETOUR (BASE BID)
G2.3.1 - CSPP NOTES - 1
G2.3.2 - CSPP NOTES - 2
G2.3.3 - CSPP DETAILS - 1
G2.3.4 - CSPP DETAILS - 2
G3.1.1 - EXISTING CONDITIONS
G3.4.1 - SOIL BORING LOGS
C1.1.1 - DEMOLITION PLAN
C2.1.1 - SITE PLAN
C2.1.2 - JOINTING PLAN
C2.2.1 - PLAN AND PROFILE - TAXIWAY F
C2.3.1 - SITE DETAILS - 1
C2.3.2 - SITE DETAILS - 2
C3.1.1 - SPOT ELEVATION PLAN
C3.1.2 - GRADING AND DRAINAGE PLAN
C3.1.3 - GRADING AND DRAINAGE PLAN
C3.2.1 - PLAN AND PROFILE - STORM - 1
C3.2.2 - PLAN AND PROFILE - STORM - 2
C3.2.3 - PLAN AND PROFILE - STORM - 3
C3.2.4 - PLAN AND PROFILE - STORM - 4
C3.3.1 - DRAINAGE DETAILS - 1
C3.3.2 - DRAINAGE DETAILS - 2
C3.3.3 - DRAINAGE DETAILS - 3
C3.3.4 - DRAINAGE DETAILS - 4
C3.4.1 - STRUCTURE DATA TABLE
C4.1.1 - EROSION CONTROL PLAN PRE-CONSTRUCTION - 1
C4.1.2 - EROSION CONTROL PLAN DURING CONSTRUCTION - 1
C4.1.3 - EROSION CONTROL PLAN DURING CONSTRUCTION - 2
C4.3.1 - EROSION CONTROL DETAILS - 1
C4.3.2 - EROSION CONTROL DETAILS - 2
C5.1.1 - PAVEMENT MARKING AND SIGNAGE PLAN
C5.3.1 - MISCELLANEOUS SITE DETAILS
AG1.1.1 - OVERALL CSPP (ADDITIVE ALTERNATES)
AG1.2.2 - DETAILED CSPP - ADDITIVE ALTERNATE NO. 1
AG1.1.3 - DETAILED CSPP - ADDITIVE ALTERNATE NO. 2
AC2.1.1 - PAVEMENT REHABILITATION PLAN (ADDITIVE ALTERNATES) - OVERALL
AC2.1.2 - PAVEMENT REHABILITATION PLAN (ADDITIVE ALTERNATES) - 1
AC2.1.3 - PAVEMENT REHABILITATION PLAN (ADDITIVE ALTERNATES) - 2
AC2.1.4 - PAVEMENT REHABILITATION PLAN (ADDITIVE ALTERNATES) - 3
AC2.3.1 - PAVEMENT REHABILITATION DETAILS (ADDITIVE ALTERNATES)
Page:
Next
Use Ctrl + mouse scroll wheel over the document to zoom.