FWA Extend Taxiway G and Construct Tailane K1
Choose Plan Sheet:
«
G0.0.01 - TITLE SHEET
G0.0.1 - SHEET INDEX AND ESTIMATE OF QUANTITIES
G0.0.2 - MASTER LEGEND AND ABBREVIATIONS
G1.1.1 - SCOPE OF WORK
G1.1.2 - SURVEY CONTROL PLAN
G1.1.3 - GEOMETRIC PLAN - 1
G1.1.4 - GEOMETRIC PLAN - 2
G2.1.1 - SITE LOGISTICS PLAN
G2.1.2 - OVERALL CONSTRUCTION SAFETY AND PHASING PLAN (CSPP)
G2.1.3 - DETAILED CSPP - SEQUENCE 1
G2.1.4 - DETAILED CSPP - SEQUENCE 2
G2.1.5 - DETAILED CSPP - SEQUENCE 3 (ADDITIVE ALTERNATE NO. 1)
G2.2.1 - SITE LOGISTICS AND CSPP DETAILS - 1
G2.2.2 - SITE LOGISTICS AND CSPP DETAILS - 2
G2.3.1 - SITE LOGISTICS AND CSPP NOTES - 1
G2.3.2 - SITE LOGISTICS AND CSPP NOTES - 2
G3.1.1 - EXISTING CONDITIONS - 1
G3.1.2 - EXISTING CONDITIONS - 2
G3.1.3 - EXISTING CONDITIONS - 3
G3.2.1 - BORING LOGS
G3.2.2 - BORING LOGS
G3.2.3 - CORING LOGS
D1.1.1 - DEMOLITION PLAN - 1
D1.1.2 - DEMOLITION PLAN - 2
C1.1.1 - SITE PLAN - 1
C1.1.2 - SITE PLAN - 2
C1.2.1 - TYPICAL SECTION - 1
C1.2.2 - TYPICAL SECTION - 2
C1.2.3 - MISCELLANEOUS SITE DETAILS
C2.1.1 - PLAN AND PROFILE - LINE G
C2.1.2 - PLAN AND PROFILE - LINE PR K1
C2.1.3 - PLAN AND PROFILE - LINE TVAR
C2.1.4 - PLAN AND PROFILE - LINE VAR
C2.1.5 - SPOT ELEVATION PLAN - 1
C2.1.6 - SPOT ELEVATION PLAN - 2
C2.1.7 - JOINTING PLAN
C3.1.1 - GRADING AND DRAINAGE PLAN - 1
C3.1.2 - GRADING AND DRAINAGE PLAN - 2
C3.1.3 - DRAINAGE PLAN AND PROFILE - 1
C3.1.4 - DRAINAGE PLAN AND PROFILE - 2
C3.1.5 - DRAINAGE PLAN AND PROFILE - 3
C3.1.6 - DRAINAGE PLAN AND PROFILE - 4
C3.1.7 - DRAINAGE PLAN AND PROFILE - 5
C3.2.1 - DRAINAGE DETAILS - 1
C3.2.2 - DRAINAGE DETAILS -2
C3.2.3 - DRAINAGE DETAILS - 3
C4.1.1 - STORMWATER POLLUTION PREVENTION PLAN - 1
C4.1.2 - STORMWATER POLLUTION PREVENTION PLAN - 2
C4.1.3 - STORMWATER POLLUTION PREVENTION PLAN - 3
C4.2.1 - SWPPP DETAILS
C4.3.1 - SWPPP NARRATIVE
C5.1.1 - PAVEMENT MARKING AND SIGNAGE PLAN
C5.2.1 - PAVEMENT MARKING AND SIGNAGE DETAILS
E1.1.1 - AIRFIELD ELECTRICAL PLAN
E1.1.2 - AIRFIELD ELECTRICAL PLAN
E1.1.3 - AIRFIELD ELECTRICAL PLAN (ADDITIVE ALTERNATE NO. 1)
E1.2.1 - GUIDANCE SIGN DETAILS AND TABLE
E1.2.2 - ELECTRICAL DETAILS
U1.0.1 - OVERALL UTILITY PLAN
U1.1.1 - UTILITY PLAN - 1
U1.1.2 - UTILITY PLAN - 2
U2.1.1 - WATER MAIN PLAN AND PROFILE - 1
U2.1.2 - WATER MAIN PLAN AND PROFILE - 2
U2.1.3 - WATER MAIN PLAN AND PROFILE - 3
U3.1.1 - SANITARY SEWER PLAN AND PROFILE
U4.1.1 - FAA CONTROL DUCT BANK PLAN AND PROFILE - 1
U4.1.2 - FAA CONTROL DUCT BANK PLAN AND PROFILE - 2
U5.1.1 - SITE ELECTRIC DUCT BANK PLAN AND PROFILE - 1
U5.1.2 - SITE ELECTRIC DUCT BANK PLAN AND PROFILE - 2
U6.1.1 - SITE COMMUNICATION DUCT BANK PLAN AND PROFILE - 1
U6.1.2 - SITE COMMUNICATION DUCT BANK PLAN AND PROFILE - 2
U7.1.1 - NATURAL GAS PLAN AND PROFILE - 1
U7.1.2 - NATURAL GAS PLAN AND PROFILE - 2
U7.1.3 - NATURAL GAS PLAN AND PROFILE - 3
U8.2.1 - UTILITY DETAILS
U8.2.2 - UTILITY DETAILS
U8.2.3 - UTILITY DETAILS
U8.2.4 - UTILITY DETAILS
U8.2.5 - UTILITY DETAILS
U8.2.6 - UTILITY DETAILS
X0.0.0 - CROSS SECTIONS - OVERALL PLAN
X1.1.1 - CROSS SECTIONS - LINE G
X1.1.2 - CROSS SECTIONS - LINE G
X1.1.3 - CROSS SECTIONS - LINE PR K1
X1.1.4 - CROSS SECTIONS - LINE PR K1
X1.1.5 - CROSS SECTIONS - LINE VAR
X1.1.6 - CROSS SECTIONS - LINE VAR
X1.1.7 - CROSS SECTIONS - LINE TVAR
X1.1.8 - CROSS SECTIONS - LINE TVAR