Eastern Engineering Plan Room

Logo

Selma Middle School Interior Renovations

Order

Selma Middle School Interior Renovations

Contact

Company Contact

Taylor Architects
Bruce Everetts
Location

Location


Pre-Bid Information

Pre-Bid Information

04/08/2026 03:03 PM ET
A pre-bid meeting be conducted on site at the Middle School commencing at 3 :30 p.m. on April 8th, 2026.
Bid Information

Bid Information

04/16/2026 01:00 PM ET

Bid Categories

BIDDER
Subcontractor/Supplier
(C) Eastern Engineering Use Only

Description

Description

Specs are on the drawings

Job Purchase Information:

---Complete sets of bidding documents are available, for a $50 Refundable Deposit check per set, made payable to Liberty Perry School Corporation (include the job name in the reference line).

---Email a copy of the refundable deposit check (for shipping and delivery orders) to jamie.vaughn@easternengineering.com AND deliver the original check (for all orders) to Eastern Engineering-Ft. Wayne Office.

Only Complete sets of plans and specifications will be distributed. Any unsuccessful bidder, upon returning such sets in good and usuable condition within (10) ten days of the bid date will be refunded their deposit.

---If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering Supply and are posted on the Spec Sheets tab.