(ORIGINAL)Hamilton Heights School District Project Vision Phase 1 - H.S. Addition and Renovation

 
 COVER
COVER
0010-COVER.TIF
 
 G0-2
INDEX
0020-G0-2.TIF
 
 C100
TITLE SHEET
0030-C100.TIF
 
 C101
EXISTING TOPOGRAPHY
0040-C101.TIF
 
 C102
DEMOLITION PLAN
0050-C102.TIF
 
 C103
OVERALL PLAN
0060-C103.TIF
 
 C104
SITE DEVELOPMENT PLAN
0070-C104.TIF
 
 C400
EROSION CONTROL PLAN
0080-C400.TIF
 
 C401
STORM WATER POLLUTION PREVENTION PLAN
0090-C401.TIF
 
 C500
MISCELLANEOUS DETAILS AND NOTES
0100-C500.TIF
 
 C501
SANITARY SEWER & STORM SEWER DETAILS
0110-C501.TIF
 
 AC1-0
SITE DEMOLITION PLAN
0120-AC1-0.TIF
 
 AC1-1
SITE PLAN
0130-AC1-1.TIF
 
 AC2-1
SITE GRADING PLAN
0140-AC2-1.TIF
 
 AC4-1
SITE UTILITY PLAN
0150-AC4-1.TIF
 
 AC4-2
SITE UTILITY PLAN TO PRESS BOX & OVERALL SITE PLAN
0160-AC4-2.TIF
 
 AS2-1
FOUNDATION PLANS & DETAILS
0170-AS2-1.TIF
 
 AS3-1
ROOF FRAMING PLAN
0180-AS3-1.TIF
 
 AS4-1
STRUCTURAL DETAILS
0190-AS4-1.TIF
 
 L100
SITE LAYOUT & PLANTING PLAN
0200-L100.TIF
 
 L101
SITE PLANTING PLAN
0210-L101.TIF
 
 L200
SITE DETAILS
0220-L200.TIF
 
 AA0-1
CODE PLANS/OVERALL PLANS
0230-AA0-1.TIF
 
 AA1-0
ARCHITECTURAL SITE PLAN
0240-AA1-0.TIF
 
 AA1-1
ARCHITECTURAL FLOOR PLAN
0250-AA1-1.TIF
 
 AA2-1
REFLECTED CEILING PLAN
0260-AA2-1.TIF
 
 AA3-1
ROOF PLAN
0270-AA3-1.TIF
 
 AA4-1
EXTERIOR ELEVATIONS - CONCESSIONS
0280-AA4-1.TIF
 
 AA4-2
EXTERIOR ELEVATIONS - TICKET BOOTH
0290-AA4-2.TIF
 
 AA5-1
BUILDING SECTIONS
0300-AA5-1.TIF
 
 AA5-2
BUILDING SECTIONS
0310-AA5-2.TIF
 
 AA6-1
WALL SECTIONS & DETAILS
0320-AA6-1.TIF
 
 AA6-2
WALL SECTIONS & DETAILS
0330-AA6-2.TIF
 
 AA6-3
WALL SECTIONS & DETAILS
0340-AA6-3.TIF
 
 AA7-1
METAL SCREEN DETAILS
0350-AA7-1.TIF
 
 AA8-1
DOOR/FRAME SCHEDULES
0360-AA8-1.TIF
 
 AA9-1
ENLARGED FLOOR PLANS/RESTROOM PLANS
0370-AA9-1.TIF
 
 AA10-1
INTERIOR ELEVATIONS AND CASEWORK DETAILS
0380-AA10-1.TIF
 
 AA11-1
ROOM FINISH SCHEDULE & PLANS
0390-AA11-1.TIF
 
 AP1-1
PLUMBING PLAN
0400-AP1-1.TIF
 
 AP1-2
PLUMBING DETAILS
0410-AP1-2.TIF
 
 AM1-1
MECHANICAL PLAN
0420-AM1-1.TIF
 
 AE1-1
ELECTRICAL POWER PLAN
0430-AE1-1.TIF
 
 AE1-2
ELECTRICAL LIGHTING PLAN
0440-AE1-2.TIF
 
 AE1-3
ELECTRICAL OVERALL PLAN
0450-AE1-3.TIF
 
 COVER
COVER
1000-CVOER.TIF
 
 G0-1
OVERALL FLOOR PLANS
1010-G0-1.TIF
 
 G0-2
INDEX
1020-G0-2.TIF
 
 G0-3
LIFE SAFETY PLAN
1030-G0-3.TIF
 
 G0-4
LIFE SAFETY PLAN
1040-G0-4.TIF
 
 G0-5
PHASING PLAN
1050-G0-5.TIF
 
 D1-1
DEMO FLOOR PLAN - UNIT A, E
1060-D1-1.TIF
 
 D1-2
DEMO FLOOR PLAN - UNIT B, C
1070-D1-2.TIF
 
 D1-3
DEMO FLOOR PLAN - UNIT D
1080-D1-3.TIF
 
 D1-4
DEMO FLOOR PLAN - UNIT F
1090-D1-4.TIF
 
 D1-6
DEMO FLOOR PLAN - SECOND FLOOR UNIT B, C
1100-D1-6.TIF
 
 D1-8
DEMO FLOOR PLAN - SECOND FLOOR UNIT F
1110-D1-8.TIF
 
 D2-1
DEMO REFLECTED CEILING PLAN - UNIT A, E
1120-D2-1.TIF
 
 D2-2
DEMO REFLECTED CEILING PLAN - UNIT B, C
1130-D2-2.TIF
 
 D2-3
DEMO REFLECTED CEILING PLAN - UNIT D, F
1140-D2-3.TIF
 
 S0-1
GENERAL STRUCTURAL NOTES
1150-S0-1.TIF
 
 S0-2
GENERAL STRUCTURAL NOTES & SCHEDULES
1160-S0-2.TIF
 
 S2-1
FOUNDATION PLAN - UNIT F
1170-S2-1.TIF
 
 S3-1
SECOND FLOOR FRAMING PLAN - UNIT F
1180-S3-1.TIF
 
 S4-1
LOW ROOF FRAMING PLAN - UNIT F
1190-S4-1.TIF
 
 S4-2
HIGH ROOF FRAMING PLAN - UNIT F
1200-S4-2.TIF
 
 S5-1
FOUNDATION TYPICAL DETAILS
1210-S5-1.TIF
 
 S5-2
FOUNDATION SECTIONS AND DETAILS
1220-S5-2.TIF
 
 S6-1
TYPICAL MASONRY DETAILS
1230-S6-1.TIF
 
 S7-1
TYPICAL FRAMING DETAILS
1240-S7-1.TIF
 
 S7-2
TYPICAL FRAMING DETAILS
1250-S7-2.TIF
 
 S7-3
FRAMING SECTIONS AND DETAILS
1260-S7-3.TIF
 
 S7-4
FRAMING SECTIONS AND DETAILS
1270-S7-4.TIF
 
 S7-5
FRAMING SECTIONS AND DETAILS
1280-S7-5.TIF
 
 S7-6
BRACED FRAME ELEVATIONS
1290-S7-6.TIF
 
 A0-1
ARCHITECTURAL INDEX
1300-A0-1.TIF
 
 A0-2
SITE PLAN
1310-A0-2.TIF
 
 A0-3
CONTROL JOINT PLAN
1320-A0-3.TIF
 
 A1-1
DIMENSION FLOOR PLAN - UNIT A, E
1330-A1-1.TIF
 
 A1-2
ARCHITECTURAL FLOOR PLAN - UNIT A, E
1340-A1-2.TIF
 
 A1-3
DIMENSION FLOOR PLAN - UNIT B, C
1350-A1-3.TIF
 
 A1-4
ARCHITECTURAL FLOOR PLAN - UNIT B, C
1360-A1-4.TIF
 
 A1-5
DIMENSION FLOOR PLAN - UNIT D, F
1370-A1-5.TIF
 
 A1-6
ARCHITECTURAL FLOOR PLAN - UNIT D, F
1380-A1-6.TIF
 
 A1-7
DIMENSION FLOOR PLAN - UNIT F
1390-A1-7.TIF
 
 A1-8
ARCHITECTURAL FLOOR PLAN - UNIT F
1400-A1-8.TIF
 
 A1-9
DIMENSION FLOOR PLAN - SECOND FLOOR UNIT A, E
1410-A1-9.TIF
 
 A1-10
ARCHITECTURAL FLOOR PLAN - SECOND FLOOR UNIT A, E
1420-A1-10.TIF
 
 A1-11
DIMENSION FLOOR PLAN - SECOND FLOOR UNIT B, C
1430-A1-11.TIF
 
 A1-12
ARCHITECTURAL FLOOR PLAN - SECOND FLOOR UNIT B, C
1440-A1-12.TIF
 
 A1-13
DIMENSION FLOOR PLAN - SECOND FLOOR UNIT D, F
1450-A1-13.TIF
 
 A1-14
ARCHITECTURAL FLOOR PLAN - SECOND FLOOR UNIT D, F
1460-A1-14.TIF
 
 A1-15
DIMENSION FLOOR PLAN - SECOND FLOOR UNIT F
1470-A1-15.TIF
 
 A1-16
ARCHITECTURAL FLOOR PLAN - SECOND FLOOR UNIT F
1480-A1-16.TIF
 
 A2-1
REFLECTED CEILING PLAN - UNIT A, E
1490-A2-1.TIF
 
 A2-2
REFLECTED CEILING PLAN - UNIT B, C
1500-A2-2.TIF
 
 A2-3
REFLECTED CEILING PLAN - UNIT D, F
1510-A2-3.TIF
 
 A2-4
REFLECTED CEILING PLAN - UNIT F
1520-A2-4.TIF
 
 A2-5
REFLECTED CEILING PLAN - SECOND FLOOR UNIT A, E
1530-A2-5.TIF
 
 A2-6
REFLECTED CEILING PLAN - SECOND FLOOR UNIT B, C
1540-A2-6.TIF
 
 A2-7
REFLECTED CEILING PLAN - SECOND FLOOR D, F
1550-A2-7.TIF
 
 A2-8
REFLECTED CEILING PLAN - SECOND FLOOR UNIT F
1560-A2-8.TIF
 
 A2-9
RCP DETAILS
1570-A2-9.TIF
 
 A3-1
ROOF PLAN - UNIT F
1580-A3-1.TIF
 
 A3-2
EXISTING BUILDING MASONRY EXTERIOR REPAIRS
1590-A3-2.TIF
 
 A4-1
EXTERIOR ELEVATIONS
1600-A4-1.TIF
 
 A5-1
BUILDING SECTIONS
1610-A5-1.TIF
 
 A6-1
WALL SECTIONS & DETAILS
1620-A6-1.TIF
 
 A6-2
WALL SECTIONS & DETAILS
1630-A6-2.TIF
 
 A6-3
WALL SECTIONS & DETAILS
1640-A6-3.TIF
 
 A6-4
WALL SECTIONS & DETAILS
1650-A6-4.TIF
 
 A6-5
WALL SECTIONS & DETAILS
1660-A6-5.TIF
 
 A6-6
WALL SECTIONS & DETAILS
1670-A6-6.TIF
 
 A7-1
PLAN DETAILS
1680-A7-1.TIF
 
 A7-2
PLAN DETAILS
1690-A7-2.TIF
 
 A8-1
DOOR/FRAME SCHEDULES
1700-A8-1.TIF
 
 A8-2
FRAME ELEVATIONS & DETAILS
1710-A8-2.TIF
 
 A8-3
DOOR/FRAME DETAILS
1720-A8-3.TIF
 
 A9-1
ENLARGED RESTROOM PLANS
1730-A9-1.TIF
 
 A9-2
ENLARGED PLANS
1740-A9-2.TIF
 
 A9-3
ENLARGED PLANS
1750-A9-3.TIF
 
 A9-4
ENLARGED PLANS
1760-A9-4.TIF
 
 A9-5
ENLARGED HUSKY GEAR SHOP
1770-A9-5.TIF
 
 A9-6
STAIR DETAILS
1780-A9-6.TIF
 
 A10-1
INTERIOR ELEVATIONS - HALL OF CHAMPIONS
1790-A10-1.TIF
 
 A10-2
INTERIOR ELEVATIONS - HALL OF CHAMPIONS
1800-A10-2.TIF
 
 A10-3
INTERIOR ELEVATIONS - HALL OF CHAMPIONS
1810-A10-3.TIF
 
 A10-4
INTERIOR ELEVATIONS
1820-A10-4.TIF
 
 A10-5
INTERIOR ELEVATIONS
1830-A10-5.TIF
 
 A10-6
INTERIOR ELEVATION DETAILS
1840-A10-6.TIF
 
 A10-7
INTERIOR ELEVATION DETAILS
1850-A10-7.TIF
 
 A10-8
INTERIOR ELEVATIONS - TILE PATTERNS
1860-A10-8.TIF
 
 A11-0
FINISH MATERIAL LIST
1870-A11-0.TIF
 
 A11-1
FINISH PLAN - UNIT A, E
1880-A11-1.TIF
 
 A11-2
FINISH PLAN - UNIT B, C
1890-A11-2.TIF
 
 A11-3
FINISH PLAN - UNIT D
1900-A11-3.TIF
 
 A11-4
FINISH PLAN - UNIT F
1910-A11-4.TIF
 
 A11-5
FINISH PLAN - SECOND FLOOR UNIT A, E
1920-A11-5.TIF
 
 A11-6
FINISH PLAN - SECOND FLOOR UNIT B, C
1930-A11-6.TIF
 
 A11-7
FINISH PLAN - SECOND FLOOR UNIT D, F
1940-A11-7.TIF
 
 A11-8
FINISH PLAN ALTERNATE - GYMNASIUM
1950-A11-8.TIF
 
 A12-1
EQUIPMENT PLAN - UNIT A, E
1960-A12-1.TIF
 
 A12-2
EQUIPMENT PLAN - UNIT B, C
1970-A12-2.TIF
 
 A12-3
EQUIPMENT PLAN - UNIT D, F
1980-A12-3.TIF
 
 A12-4
EQUIPMENT PLAN - UNIT F
1990-A12-4.TIF
 
 A12-5
EQUIPMENT PLAN - SECOND FLOOR UNIT A, E
2000-A12-5.TIF
 
 A12-6
EQUIPMENT PLAN - SECOND FLOOR UNIT B, C
2010-A12-6.TIF
 
 A12-7
EQUIPMENT PLAN - SECOND FLOOR UNIT D, F
2020-A12-7.TIF
 
 A12-8
EQUIPMENT PLAN - SECOND FLOOR UNIT F
2030-A12-8.TIF
 
 COVER
COVER
2000-COVER.TIF
 
 G0-2
INDEX
2010-G0-2.TIF
 
 FS0-1
LEGENDS, SYMBOLS, & ABBREVIATIONS
2020-FS0-1.TIF
 
 FS2-1
FIRST FLOOR FIRE SUPPRESSION PLAN
2030-FS2-1.TIF
 
 FS2-2
SECOND FLOOR FIRE SUPPRESSION PLAN
2040-FS2-2.TIF
 
 P0-1
LEGENDS, SYMBOLS & ABBREVIATIONS
2050-P0-1.TIF
 
 P1-1
FIRST FLOOR PLUMBING DEMOLITION PLAN - UNIT A, E
2060-P1-1.TIF
 
 P1-2
FIRST FLOOR PLUMBING DEMOLITION PLAN - UNIT B, C
2070-P1-2.TIF
 
 P1-3
FIRST FLOOR PLUMBING DEMOLITION PLAN - UNIT D, F
2080-P1-3.TIF
 
 P1-4
ENLARGED PLUMBING DEMO PLANS
2090-P1-4.TIF
 
 P2-0
UNDERSLAB PIPING PLAN - UNIT A, E
2100-P2-0.TIF
 
 P2-1
UNDERSLAB PIPING PLAN - UNIT B, C
2110-P2-1.TIF
 
 P2-2
UNDERSLAB PIPING PLAN - UNIT D, F
2120-P2-2.TIF
 
 P2-3
ENLARGED FOUNDATION PLAN
2130-P2-3.TIF
 
 P2-4
FIRST FLOOR PLUMBING PLAN - UNIT A, E
2140-P2-4.TIF
 
 P2-5
FIRST FLOOR PLUMBING PLAN - UNIT B, C
2150-P2-5.TIF
 
 P2-6
FIRST FLOOR PLUMBING PLAN - UNIT D, F
2160-P2-6.TIF
 
 P2-7
ENLARGED FIRST FLOOR PLUMBING PLAN
2170-P2-7.TIF
 
 P2-8
ENLARGED FIRST FLOOR PLUMBING PLAN
2180-P2-8.TIF
 
 P2-9
SECOND FLOOR PLUMBING PLAN
2190-P2-9.TIF
 
 P4-0
PLUMBING ROOF PLAN
2200-P4-0.TIF
 
 P5-0
PLUMBING DETAILS
2210-P5-0.TIF
 
 P6-0
PLUMBING SCHEDULES
2220-P6-0.TIF
 
 P7-0
SANITARY RISER DIAGRAMS
2230-P7-0.TIF
 
 P7-1
SANITARY RISER DIAGRAMS
2240-P7-1.TIF
 
 M0-1
SYMBOLS, ABBREVIATIONS & INDEX
2250-M0-1.TIF
 
 M0-2
FIRST FLOOR MECHANICAL PLAN - OVERALL
2260-M0-2.TIF
 
 M0-3
SECOND FLOOR MECHANICAL PLAN - OVERALL
2270-M0-3.TIF
 
 M0-4
ROOF MECHANICAL PLAN - OVERALL
2280-M0-4.TIF
 
 M0-5
MECHANICAL PIPING PLAN - OVERALL
2290-M0-5.TIF
 
 M1-1
FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT E
2300-M1-1.TIF
 
 M1-2
FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT A
2310-M1-2.TIF
 
 M1-3
SECOND FLOOR MECHANICAL DEMOLITION PLAN - UNIT A
2320-M1-3.TIF
 
 M1-4
ROOF MECHANICAL DEMOLITION PLAN - UNIT A
2325-M1-4.TIF
 
 M1-5
FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT B
2330-M1-5.TIF
 
 M1-6
FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT C AND D
2340-M1-6.TIF
 
 M1-7
FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT F
2350-M1-7.TIF
 
 M1-8
SECOND FLOOR MECHANICAL DEMOLITION PLAN - UNIT C
2360-M1-8.TIF
 
 M1-9
ROOF MECHANICAL DEMOLITION PLAN - UNIT F
2370-M1-9.TIF
 
 M1-10
FIRST FLOOR MECHANICAL DEMOLITION PLAN
2380-M1-10.TIF
 
 M2-1
FIRST FLOOR MECHANICAL PLAN - UNIT E
2390-M2-1.TIF
 
 M2-2
FIRST FLOOR MECHANICAL PLAN - UNIT A
2400-M2-2.TIF
 
 M2-3
SECOND FLOOR MECHANICAL PLAN - UNIT A
2410-M2-3.TIF
 
 M2-4
ROOF MECHANICAL DEMOLITION PLAN - UNIT A
2420-M2-4.TIF
 
 M2-5
FIRST FLOOR MECHANICAL PLAN - UNIT B
2430-M2-5.TIF
 
 M2-6
FIRST FLOOR MECHANICAL PLAN - UNIT C AND D
2440-M2-6.TIF
 
 M2-7
FIRST FLOOR MECHANICAL PLAN - UNIT F
2450-M2-7.TIF
 
 M2-8
SECOND FLOOR MECHANICAL PLAN - UNIT F
2460-M2-8.TIF
 
 M2-9
ROOF MECHANICAL PLAN - UNIT F
2470-M2-9.TIF
 
 M2-10
FIRST FLOOR MECHANICAL PLAN - LIFE SKILLS
2480-M2-10.TIF
 
 M2-11
SECOND FLOOR MECHANICAL PLAN - POOL MEZZANINE
2490-M2-11.TIF
 
 M3-1
FIRST FLOOR MECHANICAL PIPING PLAN - MAINS
2500-M3-1.TIF
 
 M3-2
FIRST FLOOR MECHANICAL PIPING PLAN - UNIT A
2510-M3-2.TIF
 
 M3-3
FIRST FLOOR MECHANICAL PIPING PLAN - UNIT C AND D
2520-M3-3.TIF
 
 M3-4
FIRST FLOOR MECHANICAL PIPING PLAN - UNIT F
2530-M3-4.TIF
 
 M3-5
SECOND FLOOR MECHANICAL PIPING PLAN - UNIT F
2540-M3-5.TIF
 
 M3-6
SECONDFLOOR MECHANICAL PIPING PLAN - UNIT A
2550-M3-6.TIF
 
 M5-1
MECHANICAL DETAILS
2560-M5-1.TIF
 
 M5-2
MECHANICAL DETAILS
2570-M5-2.TIF
 
 M5-3
MECHANICAL DETAILS
2580-M5-3.TIF
 
 M5-4
MECHANICAL DETAILS
2590-M5-4.TIF
 
 M6-0
MECHANICAL ATC DIAGRAMS
2600-M6-0.TIF
 
 M6-1
MECHANICAL ATC DIAGRAMS
2610-M6-1.TIF
 
 M6-2
MECHANICAL ATC DIAGRAMS
2620-M6-2.TIF
 
 M6-3
MECHANICAL ATC DIAGRAMS
2630-M6-3.TIF
 
 M6-4
MECHANICAL ATC DIAGRAMS
2640-M6-4.TIF
 
 M6-5
MECHANICAL ATC DIAGRAMS
2650-M6-5.TIF
 
 M6-6
MECHANICAL ATC DIAGRAMS
2670-M6-6.TIF
 
 M7-1
MECHANICAL SCHEDULES
2680-M7-1.TIF
 
 M7-2
MECHANICAL SCHEDULES
2690-M7-2.TIF
 
 E0-1
LEGENDS, SYMBOLS & ABBREVIATIONS
2700-E0-1.TIF
 
 E0-2
SITE ELECTRICAL DEMOLITION PLAN
2710-E0-2.TIF
 
 E0-3
SITE ELECTRICAL PLAN
2720-E0-3.TIF
 
 E0-4
SITE ENLARGED ELECTRICAL PLANS - PRESS BOX
2730-E0-4.TIF
 
 E1-1
FIRST FLOOR ELECTRICAL DEMOLITION PLAN - UNIT A & E
2740-E1-1.TIF
 
 E1-2
FIRST FLOOR ELECTRICAL DEMOLITION PLAN - UNIT B & C
2750-E1-2.TIF
 
 E1-3
FIRST FLOOR ELECTRICAL DEMOLITION PLAN - UNIT D & F
2760-E1-3.TIF
 
 E1-4
SECOND FLOOR ELECTRICAL DEMOLITION PLAN - UNIT A & E
2770-E1-4.TIF
 
 E2-1
FIRST FLOOR LIGHTING PLAN - UNIT A & E
2780-E2-1.TIF
 
 E2-2
FIRST FLOOR LIGHTING PLAN - UNIT A & E ENLARGED
2790-E2-2.TIF
 
 E2-3
FIRST FLOOR LIGHTING PLAN - UNIT B & C
2800-E2-3.TIF
 
 E2-4
FIRST FLOOR LIGHTING PLAN - UNIT B & C ENLARGED
2810-E2-4.TIF
 
 E2-5
FIRST FLOOR LIGHTING PLAN - UNIT D
2820-E2-5.TIF
 
 E2-6
FIRST FLOOR LIGHTING PLAN - UNIT F
2830-E2-6.TIF
 
 E2-7
SECOND FLOOR LIGHTING PLAN - UNIT A & E
2840-E2-7.TIF
 
 E2-8
SECOND FLOOR LIGHTING PLAN - UNIT F
2850-E2-8.TIF
 
 E3-1
FIRST FLOOR POWER PLAN - UNIT A & E
2860-E3-1.TIF
 
 E3-2
FIRST FLOOR POWER PLAN - UNIT A & E ENLARGED
2870-E3-2.TIF
 
 E3-3
FIRST FLOOR POWER PLAN - UNIT B & C
2880-E3-3.TIF
 
 E3-4
FIRST FLOOR POWER PLAN - UNIT D
2890-E3-4.TIF
 
 E3-5
FIRST FLOOR POWER PLAN - UNIT F
2900-E3-5.TIF
 
 E3-6
SECOND FLOOR POWER PLAN - UNIT A
2910-E3-6.TIF
 
 E3-7
SECOND FLOOR POWER PLAN - UNIT F
2920-E3-7.TIF
 
 E3-8
ROOF POWER PLAN - UNIT A & E
2930-E3-8.TIF
 
 E4-1
FIRST FLOOR FIRE ALARM PLAN - UNIT A & E
2940-E4-1.TIF
 
 E4-2
FIRST FLOOR FIRE ALARM PLAN - UNIT B & C
2950-E4-2.TIF
 
 E4-3
FIRST FLOOR FIRE ALARM PLAN - UNIT F
2960-E4-3.TIF
 
 E4-4
SECOND FLOOR FIRE ALARM PLAN - UNIT A
2970-E4-4.TIF
 
 E4-5
SECOND FLOOR FIRE ALARM PLAN - UNIT F
2980-E4-5.TIF
 
 E5-1
ELECTRICAL SCHEDULES
2990-E5-1.TIF
 
 E5-2
ELECTRICAL DETAILS
3000-E5-2.TIF
 
 E5-3
ELECTRICAL DETAILS
3010-E5-3.TIF
 
 E6-1
SINGLE-LINE DIAGRAM - DEMO
3020-E6-1.TIF
 
 E6-2
SINGLE-LINE DIAGRAM - NEW WORK
3030-E6-2.TIF
 
 E7-1
PANEL SCHEDULES
3040-E7-1.TIF
 
 E7-2
PANEL SCHEDULES
3050-E7-2.TIF
 
 T0-1
LEGENDS, SYMBOLS & ABBREVIATIONS
3060-T0-1.TIF
 
 T1-1
FIRST FLOOR TECHNOLOGY PLAN - UNIT A & E
3070-T1-1.TIF
 
 T1-2
FIRST FLOOR TECHNOLOGY PLAN - UNIT B & C
3080-T1-2.TIF
 
 T1-3
FIRST FLOOR TECHNOLOGY PLAN - UNIT F
3090-T1-3.TIF
 
 T1-4
SECOND FLOOR TECHNOLOGY PLAN - UNIT F
3100-T1-4.TIF
 
 T5-1
IDF LAYOUT AND ELEVATION
3110-T5-1.TIF
 
 T6-1
TECHNOLOGY DETAILS
3120-T6-1.TIF
 
 T6-2
TECHNOLOGY DETAILS
3130-T6-2.TIF