CDB #810-024-042 - DACC Remodel Clocktower Center and Ornamental Horticulture Building
Pre-Bid Information
08/29/2023 10:30 AM CT
Pre-Bid Meeting Not Mandatory: August 29, 2023 at 10:30am in the Vermillion Room, first floor at the Clock Tower, 2000 E. Main Street, Danville, IL.
Bid Information
09/19/2023 11:00 AM CT
TRADE:
SINGLE PRIME (GENERAL)
COST RANGE:
under $3,500,000
BID DATE/TIME:
September 19, 2023 at 11:00am
The public bid opening will be conducted on September 19, 2023 at 2:00pm prevailing time via WebEx.
Description
1. Select interior and exterior building rehabilitation at Clocktower Building and Ornamental Horticulture
(OH) Building.
2. Clocktower interior renovation including work rehabilitation work at restroom locations. HVAC
replacement at select areas at ground level and first level will also be coordinated with this project.
Installation of radon elimination system at crawl spaces will be installed. Additional work to sprinkler,
partial duct routing, fire alarm systems, electrical service, interior doors, frames, hardware, and glazing
replacement is included. Fire alarm scope is adding notification devices to bathrooms/ offices being
remodeled and providing duct mounted smoke detectors at new AHUs where needed.
3. Clocktower exterior work includes grade modifications at the southern end of the building and work at the
existing louvers into the Main Distribution Room at the ground level.
4. Ornamental Horticulture Building interior work includes rehabilitation of the restrooms to provide ADA
compliant facilities. HVAC equipment replacement and minor duct modifications for connections to new
HVAC equipment.