Union County Public Library - Library Addition & Renovations - #22106.00

Order

Union County Public Library - Library Addition & Renovations - #22106.00

Contact

Company Contact

LWC Inc.
Greg Drennen
Location

Location

Liberty, IN

Pre-Bid Information

Pre-Bid Information

11/24/2023 09:00 AM ET
A Pre-Bid Walk Around will be conducted at the site on November 24, 2023 to allow bidders to examine existing conditions. Meet at 2 East Seminary Street, Liberty, IN 47353 at the designated time. (9 AM) Please plan for approximately two hours minimum for review project site. The Design team will be available for questions at that time. General contractors may bring representatives or sub-contractor from each of major divisions of work. Attendance by the General Contractor is not mandatory. Sub-contractor attendance is optional.
Bid Information

Bid Information

12/15/2023 03:00 PM ET

Bid Categories

Bidder
Subcontractor/Supplier
Plan Room
(C) Eastern Engineering Use Only.

Job Purchase Information:

Bidding documents may be purchased per the options and pricing listed on the Order page (plus Processing/ECO fee, Shipping when applicable, and Tax). Credit Card or Eastern Engineering Charge Account required before printing purchases.

PLEASE NOTE - IF YOU ORDER ONLY THE FREE DOWNLOAD, IGNORE THE CHARGES THAT APPEAR AND BE SURE TO SELECT ''NO DEPOSIT/NO CHARGE'' AS YOUR PAYMENT OPTION.

If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering and are posted on the Spec Sheets tab.

*****ADDENDA ARE NOT INCLUDED IN PURCHASE SET PRICES UNLESS SPECIFICALLY STATED. ADDENDA ARE POSTED FOR DOWNLOADING ON THE INFORMATION AND ADDENDA TABS.*****

Addenda

  • 11/15/2023 - Addendum #1 (Pink) was issued  View Addendum
  • 11/29/2023 - Addendum #2 (Specifications & Drawings) was issued  View Addendum
  • 11/29/2023 - Addendum #3 (Specifications & Drawings) was issued  View Addendum
  • 11/29/2023 - Addendum #4 (Specifications & Drawings) was issued  View Addendum
  • 12/04/2023 - Addendum #5 (Specifications & Drawings) was issued  View Addendum