Eastern Engineering Plan Room

Logo

Hamilton Southeastern Schools - Fishers Elementary School Addition & Renovation

Hamilton Southeastern Schools - Fishers Elementary School Addition & Renovation

Contact

Company Contact

Wurster Construction
Phil Schmitt
Location

Location

Fishers. IN

Pre-Bid Information

Pre-Bid Information

01/25/2024 03:00 PM ET
There will be a pre-bid walk-through on-site site at 3:00 P.M. Indianapolis time, Thursday, January 25, 2024 at Fishers Elementary 11442 Lantern Rd Fishers IN 46038. Meet at the front entrance of the school.
Bid Information

Bid Information

02/15/2024 02:00 PM ET

Bid Categories

01:General Trades/Concrete
02:Structural Demolition
02A:Selective Demolition
04:Masonry
05:Structural Steele
07:Roofing
07A:Metal Panels
08:Aluminum & Glazing
08A:Doors & Hardware
09:Metal Studs, Drywall, Insulation & Acoustical Ceilings
09A:Flooring & Tile
09B:Painting, Wall Covering & Staining
11:Kitchen Equipment
21:Fire Suppresion
22:Plumbing
23:Mechanical, HVAC, Ductwork & Temperature Controls
26:Electrical
31:Earthwork & Utilities
32:Landscape
32A:Paving & Stone
32B:Fencing
Bidders
Sub/Supplier
Plan Room
(C) Eastern Engineering Use Only

Job Purchase Information:

Bidding documents may be purchased per the options and pricing listed on the Order page (plus Processing/ECO fee, Shipping when applicable, and Tax). Credit Card or Eastern Engineering Charge Account required before printing purchases.

If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering and are posted on the Shipping Information tab.

*****ADDENDA ARE NOT INCLUDED IN PURCHASE SET PRICES UNLESS SPECIFICALLY STATED. ADDENDA ARE POSTED FOR DOWNLOADING ON THE INFORMATION AND ADDENDA TABS.*****

Addenda

  • 01/29/2024 - Addendum #1 (Specifications & Drawings) was issued  View Addendum
  • 02/02/2024 - Addendum #2 (Specifications & Drawings) was issued  View Addendum
  • 02/12/2024 - Addendum #3 (Specifications & Drawings) was issued  View Addendum
  • 02/12/2024 - Addendum #4 (Specifications & Drawings) was issued  View Addendum
  • 02/14/2024 - Addendum #5 (Gray) was issued  View Addendum