Eastern Engineering Plan Room

Logo

Fort Wayne Airport Hangar 2003 Renovations

  Name Delivery Method Date
  Addendum #1 Compiled.pdf
Addendum 1 is being emailed.
8/14/2025
  Addendum 2 (Drawings & Specs).pdf
Addendum 2 was issued
8/21/2025
  Addendum 3 (Drawings & Specs).pdf
Addendum 3 is being emailed.
8/28/2025
  Addendum #4 Compiled.pdf
Addendum 4 is being emailed.
9/5/2025